As found from your determine beneath, ongoing auger is used to drill the borehole, elevate up drilled soil, and pour concrete even though the auger is moved up. Subsequently, the borehole does not require casing or hydrostatic stress to avoid harm to the borehole wall.Demolition of the surplus concrete above the Slice-off degree shall be performed